power plant Westfalen
Hamm Uentrop
In Hamm, the coal-mining blocks D and E have been built with a total output of around 1,600 megawatts.
We planned the boiler houses for both blocks, TIR 4 and TIR 6, the EMI – measuring house at the cooling tower, biaxial curved coal-band bridges and corner towers.
power plant Westfalen - Blocks D and E
aerial photo Hans Blossey
our services for approx. 7000 to
- detail engineering
- workshop planning